5A13 0701 Neville Hill T&R.S.M.D to Leeds
Departing on 1st January 2025

operated by
LNER
InterCity 225 (9 coaches)
91109
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Neville Hill T&R.S.M.D [XNL]
Pathed as Electric locomotive, trailing load 410 tonnes at 125mph
0701
0700
-1
0.34
pass
0703
pass
0700
-3
DPT
UHG
1.08
0708
0717
0703
0718¾
+1
UHG
UH
1.66
pass
0719½
pass
0721½
+2
UH
DH
2.10
8
0721
0722¾
+1
DH