2Y01 0549 Heathrow Airport Terminal 5 to London Paddington
Departing on 15th December 2024

operated by
Elizabeth Line
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
3
0549
0549
0550
+1
UT5
1.59
2
0553
0554
0553
0554½
0553¾
0554¼
UT5
UA
4.00
pass
0557½
pass
0557½
4.18
pass
0558
pass
0558¼
ML
5.13
pass
0558½
pass
0558¾
UA
UM
5.36
2
0600
0600
0559½
0600½
0559¾
0600½
ML
6.37
pass
0602
pass
0601¾
7.21
2
0603
0603
0603
0603½
0603
0603¾
ML
7.45
pass
0604
pass
0604¾
8.79
1
pass
0605½
pass
0605¾
9.53
pass
0606
pass
0606¼
9.61
pass
0606
pass
0606½
10.51
2
0607
0608
0607
0608
0608
0608¾
ML
11.27
pass
0609
pass
0609¼
ML
ML
12.06
2
pass
0610
pass
0610½
12.54
pass
0610½
No report
13.07
pass
0611½
pass
0611
13.47
pass
0612
pass
0611½
14.34
pass
0613
pass
0612¾
UM
2
14.74
pass
0614
pass
0613¼
15.61
pass
0615
pass
0614¼
16.22
4
0617
0616
0616½
2