5B44 2245 Edinburgh to Haymarket Depot
Departing on 19th November 2024

operated by
ScotRail
3 coaches
170413
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Edinburgh [EDB]
Pathed as Diesel locomotive, trailing load 324 tonnes at 100mph
19
2245
2243½
-1
Z
0.32
pass
2246½
pass
2244¾
-1
Z
DN
1.19
2
2248½
2249
pass
2246¾
-2
1.66
pass
2251½
No report
2.07
2253
2248
-5