1H20 2124 London Bridge to Hastings
Departing on 7th October 2024

operated by
Southeastern

This service is partially cancelled

This service was cancelled between London Charing Cross and London Bridge due to a signalling problem (track circuit failure) (IC).

GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.61
2118
2118
2117½
2118½
-
1.23
pass
2120
-
1.31
pass
2120½
-
1.69
8
2122
2124
2122
2124
2207¾
+43
7
2.17
pass
2125
pass
2208½
+43
2.42
pass
2125½
pass
2209
+43
2.71
pass
2126
pass
2209¾
+43
3.32
pass
2126½
pass
2210
+43
7
DKF
4.68
pass
2129
pass
2212
+43
DKF
DF
5.29
pass
2130
pass
2212¾
+42
5.47
pass
2130
pass
2213¼
+43
6.36
pass
2131
pass
2214
+43
DKF
DKF
7.16
2
pass
2132½
pass
2216½
+44
FL
7.44
pass
2133
pass
2216½
+43
8.78
3
pass
2134½
pass
2220¼
+45
FL
10.21
2
pass
2135½
pass
2221¾
+46
11.19
2
pass
2136½
pass
2222¾
+46
12.24
pass
2137½
pass
2223¼
+45
12.53
2
pass
2138
pass
2224
+45
13.65
3
pass
2140
pass
2227½
+47
DF
DM
15.25
2
pass
2141½
pass
2230½
+49
16.44
2
pass
2142½
pass
2232¼
+50
20.46
2
pass
2145½
pass
2236
+50
22.09
3
2148
2149
2147½
2149
pass
2237¾
+48
DM
DM
27.02
2
pass
2154½
pass
2245¼
+50
29.46
3
2158
2159
2157½
2159
2249½
2252¾
+53
DM
DH
30.27
pass
2200½
pass
2254½
+54
32.74
2
2204
2205
2204
2205
2257½
2258½
+53
33.60
pass
2206½
pass
2300
+53
34.36
2
2208
2210
2208
2210
2301½
2303¼
+53
35.23
pass
2212
pass
2305
+53
36.57
2
pass
2213½
pass
2306¾
+53
39.27
2
2217
2217
2216½
2217½
pass
2310
+52
40.44
pass
2219
pass
2311½
+52
43.70
2
pass
2222
pass
2314½
+52
47.38
2
2226
2226
2225½
2226½
pass
2317½
+51
49.51
2
2230
2230
2229½
2230½
pass
2319¼
+48
51.62
pass
2233½
pass
2320¾
+47
55.50
2
2238
2238
2237½
2238½
2324¾
2325½
+47
57.54
2
pass
2241½
pass
2325¾
+44
60.63
2
pass
2246
pass
2330¾
+44
60.73
pass
2246
pass
2331
+45
61.59
2
2248
2249
2248
2249
pass
2333
+44
62.37
3
2253
2253
2335½
+42
DH