1H50 1431 Hastings to London Charing Cross
Departing on 24th September 2024

operated by
Southeastern

This service is cancelled.

This service was cancelled due to a signalling problem (track circuit failure) (IC).

GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
1431
1431
-
0.58
1434
1434
1433½
1434½
-
1.44
pass
1436½
-
1.54
pass
1436½
-
4.63
pass
1441
-
6.67
1444
1445
1444
1445
-
10.55
pass
1449
-
12.66
pass
1451
-
14.79
pass
1453
-
18.47
pass
1456
-
21.73
pass
1459
-
23.10
1501
1501
1500½
1501
-
25.60
pass
1504½
-
28.01
1508
1509
1508
1509
-
28.57
pass
1510½
-
29.43
1512
1513
1512
1513
-
32.10
pass
1516½
-
32.71
1519
1520
1518½
1520
-
35.35
pass
1523
-
40.28
1529
1529
1528½
1529½
-
41.71
pass
1531½
-
45.73
pass
1534½
-
47.12
pass
1535½
-
48.52
1538
1538
1537½
1538½
-
49.64
pass
1540
-
50.13
pass
1540½
-
51.18
pass
1541½
-
52.16
pass
1542½
-
53.39
pass
1543½
-
54.73
pass
1544½
-
55.21
pass
1545
-
56.01
pass
1546½
-
56.70
pass
1547½
-
57.49
pass
1548½
-
59.05
pass
1550½
-
59.46
pass
1551
-
59.75
pass
1551½
-
60.48
1553
1555
1553
1555
-
61.06
pass
1556½
-
61.14
pass
1557
-
61.56
1559
1600
1559
1600
-