1H70 1931 Hastings to London Bridge
Departing on 7th October 2024

operated by
Southeastern

This service is partially cancelled

This service was cancelled between London Bridge and London Charing Cross due to a signalling problem (track circuit failure) (IC).

GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
4
1931
1931
1956
+25
UH
0.58
1
1934
1934
1933½
1934½
1958¼
1959½
+25
1.44
pass
1936½
pass
2001½
+25
UH
1.54
1
pass
1936½
pass
2002
+25
4.63
1
pass
1941
pass
2006
+25
6.67
1
1944
1945
1944
1945
2009
2009¾
+24
10.55
pass
1949
pass
2016¾
+27
12.66
1
pass
1951
pass
2018½
+27
14.79
1
pass
1953
pass
2021
+28
18.47
1
pass
1956
pass
2024¼
+28
21.73
pass
1959
pass
2026¼
+27
23.10
1
2001
2001
2000½
2001
2027¾
2028¾
+27
25.60
1
pass
2004½
pass
2032
+27
27.14
pass
2006
pass
2036¾
+30
28.01
1
2008
2009
2008
2009
2039
2040½
+31
28.57
pass
2010½
pass
2041½
+31
29.43
1
2012
2013
2012
2013
2043½
2044¼
+31
32.10
pass
2017½
pass
2047¼
+29
32.71
2
2020
2021
2019½
2021
2049½
2050¾
+29
UH
UM
35.35
1
pass
2024
pass
2054
+30
40.28
1
2030
2031
2029½
2031
2058½
2059¾
+28
UM
UM
41.71
1
pass
2033
pass
2102¼
+29
45.73
1
pass
2036½
pass
2105¾
+29
47.12
1
pass
2037½
pass
2106¾
+29
48.52
2
pass
2039
pass
2107¾
+28
UM
UF
49.64
1
pass
2040
pass
2108¾
+28
50.13
pass
2040½
pass
2109
+28
51.18
1
pass
2041½
pass
2110
+28
52.16
1
pass
2042½
pass
2111
+28
53.39
2
pass
2043½
pass
2112
+28
UF
UF
54.73
pass
2044½
pass
2113½
+28
55.21
1
pass
2045
pass
2125
+40
56.01
pass
2046½
pass
2143¾
+57
FL
UKF
56.70
pass
2047½
pass
2149½
+62
57.08
pass
2047½
pass
2149¾
+62
57.49
pass
2048½
pass
2152½
+64
UF
UKF
59.05
pass
2050½
pass
2154¾
+64
UKF
8
59.46
pass
2051
pass
2155
+64
59.75
pass
2051½
pass
2155¾
+64
60.20
pass
2052
pass
2156½
+64
8
60.48
8
2053
2055
2053
2055
2157¾
+64
61.06
pass
2056½
-
61.14
pass
2057
-
61.56
2059
2100
2059
2100
-