2S34 1231 London Charing Cross to London Bridge
Departing on 25th June 2024

operated by
Southeastern

This service is partially cancelled

This service was cancelled between London Bridge and Sevenoaks due to late arrival of an inbound service (YI).

GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.61
1234
1234
1233½
1234½
-
1.23
pass
1236
-
1.31
pass
1236½
-
1.69
6
1238
1240
1238
1240
1238
2.42
pass
1241½
-
2.71
pass
1242
-
3.32
pass
1242½
-
4.68
pass
1245
-
6.01
1248
1249
1248
1249
-
6.40
pass
1250½
-
7.20
1253
1254
1253
1254
-
7.48
pass
1255
-
9.02
1257
1258
1257
1258
-
10.25
1301
1301
1300½
1301
-
11.23
1303
1303
1303
1303½
-
12.28
pass
1305
-
12.57
1307
1308
1307
1308
-
13.69
1312
1314
1312
1314
-
15.29
1317
1317
1316½
1317
-
16.48
1320
1320
1319½
1320
-
20.50
1325
1325
1324½
1325
-