5K09 0644 Wimbledon Park Depot Sdgs to London Waterloo
Departing on 1st January 2025

operated by
South Western Railway
10 coaches
701037
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Wimbledon Park Depot Sdgs
Pathed as Electric multiple unit at 75mph
0644
0648
+4
EFD
0.00
0649
0649
N/R
0649
UF
0.58
pass
0650½
pass
0652¼
+1
2.30
8
pass
0653½
pass
0654¾
+1
UF
UMF
2.78
pass
0654½
pass
0655½
+1
3.54
pass
0655
pass
0656¼
+1
4.26
pass
0656
pass
0656¾
4.75
5
pass
0657
pass
0658
+1
5.64
pass
0658
pass
0659½
+1
6.24
5
0700
0702
+2