2F63 2050 London Waterloo to Woking
Departing on 2nd January 2025

operated by
South Western Railway
8 coaches
455705
455864
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 75mph
1
2050
2050
2049¾
DMS
0.40
pass
2051½
pass
2051¼
1.29
8
2053
2054
2053
2054
2053¼
2054½
1.78
pass
2055
pass
2055½
2.50
pass
2056
pass
2056¼
3.26
pass
2057
pass
2056¾
3.74
11
2058
2059
2058
2059
2058½
2059
DMS
DS
5.46
3
2102
2102
2102
2102½
2101¾
2102¼
DS
7.19
8
2106
2106
2105½
2106½
2105
2105¾
7.49
pass
2107½
pass
2106½
8.51
3
pass
2108½
pass
2108
9.62
4
pass
2109½
pass
2109
10.78
2
pass
2111½
pass
2110¼
-1
12.03
3
2114
2114
2113½
2114½
2112
2113¾
DS
DS
13.26
pass
2116½
pass
2115½
14.30
4
2118
2118
2118
2118½
2116¾
2118
15.72
2
2121
2121
2121
2121½
2120¼
2120¾
17.05
2
2124
2124
2123½
2124
2122¾
2123¾
19.11
3
2127
2127
2127
2127½
2126¾
2127½
DS
DS
20.26
pass
2129
No report
20.31
2
2130
2130
2129½
2130
2129¼
2129¾
DS
21.53
3
2133
2133
2132½
2133
2131½
2133
24.26
3
2138
2138
2137¾
DS