5S45 1420 Wimbledon Park Depot Sdgs to London Waterloo
Departing on 25th June 2024

operated by
South Western Railway
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Wimbledon Park Depot Sdgs
Pathed as Electric multiple unit at 75mph
1420
1424
+4
EP
0.00
1445
1447
N/R
1448
+1
UB
0.54
pass
1450½
pass
1450¾
B
1.46
pass
1452½
No report
2.44
pass
1455
pass
1454
-1
3.15
3
pass
1457
pass
1457
UF
3.44
3
pass
1457½
pass
1457¼
EPR
DWF
4.30
4
pass
1459
pass
1458½
UWF
UWF
5.07
pass
1501
pass
1459½
-1
UWF
UW
5.54
2
pass
1501½
pass
1500¾
UW
UW
6.26
pass
1502½
pass
1501½
6.75
2
pass
1504
pass
1502¾
-1
7.64
pass
1506½
pass
1504¾
-1
UW
WR2
8.24
20
1508½
1507¼
-1
WR2