6O09 1925 Colnbrook Baa Gbrf to Grain Oil Terminal Gbrf
Departing on 8th January 2025

This train runs as required

This service runs on an as required basis, and it has not yet been activated in the railway computer systems. This alert will disappear if the train is activated.

If the service should have departed by now, this normally means it is not running. If the train is set to run in the future, then check again closer to the time.

WTT
Route
Location
Pl
Arr
Dep
Path
Line
pass
1944½
RL
4
pass
1947½
RL
Hanwell Bridge Loop
Service stops for pathing (passing train)
DGL
1950½
1957
RL
3
pass
1958
4
pass
2001
RL
pass
2005
RL
GL
Acton Main Line [AML]
Service stops for staffing reasons
UGL
2010
2015
Willesden S.W.S. [XWS]
Service stops for pathing (passing train)
USW
2020
2021
pass
2026
pass
2038
UKL
Longhedge Jn
Service stops for pathing (passing train)
2041
2052½
pass
2054½
AL
pass
2100½
2
pass
2101½
pass
2103½
2
pass
2107½
pass
2108
6
pass
2117½
pass
2119½
pass
2129½
pass
2132½
pass
2134½
pass
2135½
Dartford Jn [XRT]
Service stops for pathing (passing train)
2137½
2143½
RVL
3
pass
2145
2
pass
2158½
pass
2206½
Cliffe Signal Nk509
Service exchanges token here
2210½
2213½
Grain Level Crossing
Service exchanges token here
2229½
2230½