0918 London Bridge to Grove Park Up C.H.S.Departing on 10th January 2025
operated by
Southeastern
This service is partially cancelled
This service was cancelled between London Bridge and London Bridge due to a power supply problem (I2).
This train does not run in passenger service, and is not visible in our simple view.
To view the service, go to the detailed view through the button below.