9R34 1219 Three Bridges to London Bridge
Departing on 29th December 2024

operated by
Thameslink
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
1
1219
1219
1218¾
US
1.67
pass
1221½
pass
1221½
2.54
2
1223
1224
1223
1224½
1223
1223¾
US
US
3.41
1
1227
1227
1226½
1227
1225½
1227¼
5.64
1
pass
1229½
pass
1229½
7.63
1
pass
1231
pass
1231
US
URH
9.51
2
1234
1237
1234
1237½
1233
1236½
URH
URH
11.32
1
1241
1241
1241
1241½
1239¾
1241¼
15.08
1
1246
1247
1246
1247
1244¾
1247
16.07
pass
1248½
pass
1248¼
URH
UF
16.78
1
1250
1250
1250
1250½
1250¼
1251
17.73
1
pass
1252
pass
1252½
19.06
1
pass
1253
pass
1253½
19.79
2
1255
1255
1254½
1255½
1254¾
1255¾
FL
FRV
20.38
pass
1256½
pass
1257½
+1
FRV
UBF
21.02
pass
1257½
pass
1257½
21.52
3
1259
1300
1259
1300
1258¾
1259¾
UBF
UF
22.60
pass
1301½
pass
1301½
23.12
pass
1302
pass
1302
23.75
pass
1303
pass
1302½
FL
24.57
pass
1303½
pass
1303¼
25.48
pass
1304½
pass
1304
26.51
pass
1305½
pass
1305
27.37
4
pass
1306
pass
1305¾
28.15
pass
1307
pass
1306¼
UF
USF
28.60
pass
1309
pass
1307½
-1
5
29.21
pass
1310
pass
1307¾
-1
29.50
pass
1310½
No report
29.75
pass
1311
No report
30.23
4
1312
1312
1312