9T11 0809 London Bridge to Brighton
Departing on 15th December 2024

operated by
Thameslink

This service is cancelled.

This service was cancelled due to a planned cancellation by the train operator (PG).

GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
0809
0809
-
0.30
pass
0810½
-
0.55
pass
0811
-
1.04
pass
0811½
-
1.45
pass
0812½
-
2.58
pass
0814½
-
3.44
pass
0815
-
4.47
pass
0816
-
5.38
pass
0817
-
6.20
pass
0817½
-
7.03
pass
0818
-
7.35
pass
0818½
-
8.43
pass
0819½
-
9.13
pass
0820½
-
9.57
pass
0821
-
10.16
0822
0823
0822
0823
-
11.09
pass
0825
-
12.22
pass
0826
-
13.17
pass
0827
-
14.08
pass
0828½
-
15.07
pass
0829½
-
18.63
pass
0832½
-
20.44
pass
0834
-
22.32
pass
0835½
-
24.31
pass
0837½
-
26.54
pass
0840½
-
27.41
0842
0844
0842
0844½
-
28.28
pass
0846
-
30.15
0849
0850
0849
0850½
-
32.51
pass
0853½
-
34.58
pass
0855
-
37.67
pass
0857½
-
38.53
0859
0900
0859
0900
-
41.46
0904
0904
0903½
0904
-
41.63
pass
0904½
-
42.33
0906
0906
0905½
0906½
-
44.36
0910
0910
0909½
0910½
-
50.15
0917
0917
0916½
0917½
-
51.43
0923
0923
-