5V90 1209 London Bridge to Wimbledon
Departing on 8th January 2025

operated by
Thameslink
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
12
1209
1214¼
+5
9
0.30
pass
1212
pass
1215¼
+3
0.55
pass
1214
pass
1216
+2
1.04
pass
1214½
pass
1217½
+3
9
LRV
1.45
pass
1215
pass
1220
+5
LRV
DSL
1.52
2
pass
1215
pass
1220½
+5
2.16
pass
1216
pass
1222½
+6
2.47
2
pass
1218½
pass
1224¾
+6
3.25
1
pass
1222½
pass
1227½
+5
DSL
DP
4.12
2
pass
1224
pass
1230¾
+7
4.53
2
pass
1224½
pass
1233¼
+8
5.76
Tulse Hill [TUH]
1
Service stops for pathing (passing train)
4
1227
1230
1237½
1237¾
+7
DP
DWN
6.30
pass
1233½
pass
1239¼
+5
DWN
DCP
6.54
2
pass
1234½
pass
1241¼
+6
7.45
pass
1238
No report
8.24
2
pass
1241
pass
1251½
+10
DCP
9.10
pass
1243
pass
1254½
+11
DCP
DCS
9.65
Norwood Junction [NWD]
1
Service stops for pathing (passing train)
6
1246
1251½
1257
1257¼
+5
DCS
DW
10.35
pass
1254
pass
1259¾
+5
10.59
pass
1255
pass
1300¼
+5
11.45
4
pass
1257
pass
1302¼
+5
12.50
Approaching
Waddon [WDO]
2
pass
1258
pass
1304
+5
14.15
2
pass
1300
pass
1305¼
+5
15.08
2
pass
1301
pass
1306¼
+5
16.11
2
pass
1302½
pass
1309
+6
DW
USH
17.14
1
pass
1305
pass
1312½
+7
17.74
1
pass
1306½
pass
1314
+7
18.72
1
pass
1308
pass
1315½
+7
19.29
1
pass
1309
pass
1316½
+7
20.00
1
pass
1310
pass
1317¾
+7
20.48
1
pass
1311
pass
1318¾
+7
21.10
pass
1312
pass
1320
+8
UHL
21.40
9
1313
1320
+7