5V90 1209 London Bridge to Wimbledon
Departing on 10th January 2025

operated by
Thameslink
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
12
1209
1213¼
+4
10
0.30
pass
1212
pass
1214½
+2
10
11
0.55
pass
1214
pass
1215¾
+1
1.04
pass
1214½
pass
1216¼
+1
11
LRV
1.45
pass
1215
pass
1217½
+2
LRV
DSL
1.52
2
pass
1215
pass
1217¾
+2
2.16
pass
1216
pass
1218¾
+2
2.47
2
pass
1218½
pass
1219½
+1
3.25
1
pass
1222½
pass
1221¼
-1
DSL
DP
4.12
2
pass
1224
pass
1224
4.53
2
pass
1224½
pass
1224¾
5.76
Tulse Hill [TUH]
1
Service stops for pathing (passing train)
4
1227
1230
1227
1227
-2
DP
DWN
6.30
pass
1233½
pass
1229
-4
DWN
DCP
6.54
2
pass
1234½
pass
1231
-3
7.45
pass
1238
No report
8.24
2
pass
1241
pass
1240¼
DCP
9.10
pass
1243
pass
1243¼
DCP
DCS
9.65
Norwood Junction [NWD]
1
Service stops for pathing (passing train)
6
1246
1251½
1247
1252
DCS
DW
10.35
pass
1254
pass
1254½
10.59
pass
1255
pass
1255
11.45
4
pass
1257
pass
1257¼
12.50
Approaching
Waddon [WDO]
2
pass
1258
pass
1258¾
14.15
2
pass
1300
pass
1300¼
15.08
2
pass
1301
pass
1301
16.11
2
pass
1302½
pass
1304¼
+1
DW
USH
17.14
1
pass
1305
pass
1307¾
+2
17.74
1
pass
1306½
pass
1309¼
+2
18.72
1
pass
1308
pass
1310½
+2
19.29
1
pass
1309
pass
1311¼
+2
20.00
1
pass
1310
pass
1312½
+2
20.48
1
pass
1311
pass
1313½
+2
21.10
pass
1312
pass
1314¼
+2
UHL
21.40
9
1313
1315½
+2
USH