9T75 0151 London Bridge to Three Bridges
Departing on 23rd December 2024

operated by
Thameslink
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
11
0151
0151
0150¾
9
0.30
pass
0152½
pass
0151¾
0.55
pass
0153½
pass
0152¼
-1
1.04
pass
0154
pass
0153¼
9
DSS
1.45
pass
0155
No report
2.00
pass
0156
pass
0154½
-1
DSS
DS
2.58
2
pass
0157
pass
0155¼
-1
DS
DS
3.44
2
pass
0158
pass
0156
-1
4.47
2
pass
0159
pass
0157¼
-1
5.38
2
pass
0159½
pass
0158
-1
6.20
2
pass
0200½
pass
0159
-1
SL
7.03
2
pass
0201½
pass
0159¾
-1
7.35
2
pass
0202
pass
0200¼
-1
8.43
5
pass
0203
pass
0202
DS
DBS
9.13
pass
0204
pass
0203¾
9.57
pass
0205
pass
0204
DBS
DS
10.16
5
0206
0207
0206
0207
0205¾
0206¾
SL
DF
11.09
2
pass
0209½
pass
0209
12.22
2
pass
0210½
pass
0210
13.17
2
0212
0213
0212
0213
0211½
0213¼
14.08
pass
0215
pass
0214¼
DF
DQ
15.07
pass
0216
No report
18.63
pass
0219
No report
20.44
DML
pass
0220½
No report
22.32
2
pass
0222
pass
0220
-1
DQ
DF
24.31
2
pass
0223½
pass
0221½
-1
26.54
4
0225
0226
0225
0226
0223¾
0225¾
27.41
6
0230
0231
0229½
0231½
0227¾
0230½
SL
28.28
pass
0233
pass
0232
-1
30.15
3
0236
0236
0239½
+3
DF