5S93 1925 London Waterloo to Woking
Departing on 18th December 2024

operated by
South Western Railway
4 coaches
450068
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
17
1925
1924¾
DW
0.40
pass
1926½
pass
1926½
DW
DWF
1.29
3
pass
1929
pass
1929½
1.78
pass
1930½
pass
1930¾
DWF
DW
2.50
3
pass
1932
pass
1932½
DW
DWS
3.17
pass
1933
pass
1933½
3.74
6
pass
1934
pass
1936
+2
DWS
DWS
4.60
1
pass
1935
pass
1937½
+2
5.72
4
pass
1937
pass
1938½
+1
7.07
4
pass
1938½
pass
1940½
+2
DWS
DH
7.54
2
pass
1939½
pass
1941¾
+2
8.47
2
pass
1940½
pass
1943¼
+2
9.34
pass
1941½
pass
1944¾
+3
9.53
2
pass
1942
pass
1945
+3
10.01
pass
1942½
pass
1945
+2
10.52
2
pass
1943½
pass
1945¾
+2
11.34
2
pass
1945½
pass
1946¾
+1
12.10
2
pass
1947½
pass
1947¾
13.40
2
pass
1951
pass
1949¾
-1
14.19
pass
1952
pass
1951¼
14.48
pass
1957
pass
1952¼
-4
DH
DT
16.01
2
pass
1959
pass
1956¼
-2
18.53
2
pass
2002
pass
1959½
-2
20.15
2
pass
2003½
pass
2003¾
22.15
2
pass
2007
pass
2009
+2
24.28
4
pass
2010½
pass
2013
+2
DT
DC
26.68
1
pass
2014½
pass
2016¾
+2
28.22
1
pass
2016
pass
2018
+2
29.25
pass
2017
pass
2019
+2
DC
DBC
30.24
pass
2019½
No report
30.29
2
pass
2019½
pass
2020¾
+1
DBC
DS
31.51
3
pass
2022½
pass
2021¾
34.24
Approaching
Woking [WOK]
5
2029
2027¼
-1