5S93 1925 London Waterloo to Woking
Departing on 20th December 2024

operated by
South Western Railway
4 coaches
450120
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
16
1925
1924
UW
0.40
pass
1926½
pass
1925½
UW
DWF
1.29
3
pass
1929
pass
1928¼
1.78
pass
1930½
pass
1930
DWF
DW
2.50
3
pass
1932
pass
1931½
DW
DWS
3.17
pass
1933
pass
1932
3.74
6
pass
1934
pass
1933¼
DWS
DWS
4.60
1
pass
1935
pass
1934½
5.72
4
pass
1937
pass
1935¾
7.07
4
pass
1938½
pass
1937¾
DWS
DH
7.54
2
pass
1939½
pass
1938¾
8.47
2
pass
1940½
pass
1939¾
9.34
pass
1941½
pass
1941½
9.53
2
pass
1942
pass
1941¾
10.01
pass
1942½
pass
1942¼
10.52
2
pass
1943½
pass
1944½
+1
11.34
2
pass
1945½
pass
1947½
+1
12.10
2
pass
1947½
pass
1950¾
+3
13.40
2
pass
1951
pass
1953¾
+2
14.19
pass
1952
pass
1955¼
+3
14.48
pass
1957
pass
1956
DH
DT
16.01
2
pass
1959
pass
1958
18.53
2
pass
2002
pass
2000½
-1
20.15
2
pass
2003½
pass
2002½
22.15
2
pass
2007
pass
2006½
24.28
4
pass
2010½
pass
2010¼
DT
DC
26.68
1
pass
2014½
pass
2014¼
28.22
1
pass
2016
pass
2015¾
29.25
pass
2017
pass
2016¾
DC
DBC
30.24
pass
2019½
No report
30.29
2
pass
2019½
pass
2018½
DBC
DS
31.51
3
pass
2022½
pass
2019½
-2
34.24
Approaching
Woking [WOK]
5
2029
2028½