5C99 2145 London Waterloo to Woking
Departing on 7th January 2025

operated by
South Western Railway
4 coaches
450115
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
17
2145
2142½
-2
DW
0.40
pass
2146½
pass
2144¼
-2
DW
DWF
1.29
3
pass
2148
pass
2145¾
-2
1.78
pass
2149
pass
2146½
-2
DWF
DW
2.50
3
pass
2150
pass
2147½
-2
DW
DWS
3.17
pass
2151
pass
2148
-2
3.74
6
pass
2152
pass
2149¼
-2
DWS
DWS
4.60
1
pass
2153
pass
2151
-2
5.72
4
pass
2154½
pass
2153
-1
7.07
4
pass
2156
pass
2155½
DWS
DR
8.21
2
pass
2158
pass
2159¼
+1
9.03
2
pass
2159½
pass
2202
+2
9.57
1
pass
2201
pass
2203¾
+2
DR
DT
10.66
3
pass
2204½
pass
2206¾
+2
11.22
5
pass
2206
pass
2209
+3
11.49
pass
2206½
pass
2209½
+3
12.43
2
pass
2207
pass
2210¾
+3
13.03
pass
2207½
pass
2211¼
+3
13.35
pass
2208
pass
2211½
+3
14.68
2
pass
2212
pass
2213½
+1
17.40
2
pass
2217
pass
2217½
19.02
2
pass
2220
pass
2221¾
+1
21.02
2
pass
2224
pass
2227
+2
23.15
Virginia Water [VIR]
Service stops for pathing (passing train)
4
2229
2231½
pass
2232½
+1
DT
DC
25.55
1
pass
2235½
pass
2237
+1
27.09
1
pass
2238
pass
2240¼
+2
28.12
pass
2240
pass
2241¾
+1
DC
DBC
29.11
pass
2242
No report
29.16
2
pass
2242
pass
2243¼
+1
DBC
DS
30.38
3
pass
2243½
pass
2244¼
+1
33.11
Approaching
Woking [WOK]
5
2247
2248
+1