5C99 2145 London Waterloo to Woking
Departing on 8th January 2025

operated by
South Western Railway
4 coaches
450001
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
17
2145
2142¾
-2
DW
0.40
pass
2146½
pass
2144¾
-1
DW
DWF
1.29
3
pass
2148
pass
2146¾
1.78
pass
2149
pass
2148
DWF
DW
2.50
3
pass
2150
pass
2149½
DW
DWS
3.17
pass
2151
pass
2150½
3.74
6
pass
2152
pass
2152½
DWS
DWS
4.60
1
pass
2153
pass
2154¼
+1
5.72
4
pass
2154½
pass
2156¼
+1
7.07
4
pass
2156
pass
2158½
+2
DWS
DR
8.21
2
pass
2158
pass
2200¼
+2
9.03
2
pass
2159½
pass
2201¼
+1
9.57
1
pass
2201
pass
2202¼
+1
DR
DT
10.66
3
pass
2204½
pass
2205
11.22
5
pass
2206
pass
2206¼
11.49
pass
2206½
pass
2206¾
12.43
2
pass
2207
pass
2208½
+1
13.03
pass
2207½
pass
2209¼
+1
13.35
pass
2208
pass
2210
+2
14.68
2
pass
2212
pass
2212¾
17.40
2
pass
2217
pass
2217½
19.02
2
pass
2220
pass
2220¾
21.02
2
pass
2224
pass
2225
+1
23.15
Virginia Water [VIR]
Service stops for pathing (passing train)
4
2229
2231½
pass
2230½
DT
DC
25.55
1
pass
2235½
pass
2236¾
+1
27.09
1
pass
2238
pass
2239¼
+1
28.12
pass
2240
pass
2240½
DC
DBC
29.11
pass
2242
No report
29.16
2
pass
2242
pass
2242½
DBC
DS
30.38
3
pass
2243½
pass
2243½
33.11
Approaching
Woking [WOK]
5
2247
2247¼