2U61 1933 London Waterloo to Windsor & Eton Riverside
Departing on 17th December 2024

operated by
South Western Railway
10 coaches
701017
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
20
1933
1933
1932½
WR1
0.40
pass
1934½
pass
1933¾
WR1
DWF
1.29
3
1937
1937
1936½
1937½
1936¾
1937¾
1.78
pass
1939
pass
1938¾
DWF
DW
2.50
3
pass
1940
pass
1940
DW
DWS
3.17
pass
1940½
pass
1940¼
3.74
6
1942
1943
1942
1943
1942
1943
DWS
DWS
4.60
1
pass
1944½
pass
1944½
5.72
4
1946
1947
1946
1947
1946
1946¾
7.07
4
pass
1949
pass
1949
DWS
DR
8.21
2
pass
1950
pass
1950
9.03
2
pass
1951
pass
1951
9.57
1
1952
1953
1952
1953
1952
1953¼
DR
DT
10.66
3
pass
1955
pass
1955
11.22
5
1956
1957
1956
1957
1955¾
1958¼
+1
11.49
pass
1958
pass
1958¾
+1
12.43
2
2000
2000
1959½
2000
2000¼
2001
+1
13.03
pass
2001
pass
2002
+1
13.35
pass
2001½
pass
2002¼
14.68
2
2004
2004
2003½
2004½
2004½
2005½
+1
17.40
2
2008
2008
2008
2008½
2008¾
2009½
+1
19.02
2
2011
2012
2011½
2012½
2012
2013
DT
DW
21.40
2
2016
2016
2016
2016½
2016
2017
22.48
2
2019
2019
2018½
2019
2019
2020
+1
23.63
2
2022
2022
2021½
2022
2022
2023
+1
25.48
2
2026
2026
2027
+1