2U63 2003 London Waterloo to Windsor & Eton Riverside
Departing on 18th December 2024

operated by
South Western Railway
8 coaches
450114
450017
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
17
2003
2003
2002
-1
DW
0.40
pass
2004½
pass
2004½
DW
DWF
1.29
3
2007
2007
2006½
2007½
2006¾
2007½
1.78
pass
2009
pass
2008¾
DWF
DW
2.50
3
pass
2010
pass
2010¼
DW
DWS
3.17
pass
2010½
pass
2010¾
3.74
6
2012
2013
2012
2013
2012¼
2013¼
DWS
DWS
4.60
1
pass
2014½
pass
2014¾
5.72
4
2016
2017
2016
2017
2016½
2017¼
7.07
4
pass
2019
pass
2019¾
DWS
DR
8.21
2
pass
2020
pass
2021¼
+1
9.03
2
pass
2021
pass
2022
+1
9.57
1
2022
2023
2022
2023
2023
2024
+1
DR
DT
10.66
3
pass
2025
pass
2025¾
11.22
5
2026
2027
2026
2027
2026¾
2027¾
11.49
pass
2028
pass
2028½
12.43
2
2030
2030
2029½
2030
2030¼
2031¼
+1
13.03
pass
2031
pass
2032¼
+1
13.35
pass
2031½
pass
2032¾
+1
14.68
2
2034
2034
2033½
2034½
2034¾
2035¾
+1
17.40
2
2038
2038
2038
2038½
2039¼
2040
+1
19.02
2
2041
2042
2041½
2042½
2042¾
2043½
+1
DT
DW
21.40
2
2046
2046
2046
2046½
2047
2047
22.48
2
2049
2049
2048½
2049
2050
2051
+2
23.63
2
2052
2052
2051½
2052
2053
2053
+1
25.48
2
2056
2056
2057
+1