2U67 2103 London Waterloo to Windsor & Eton Riverside
Departing on 18th December 2024

operated by
South Western Railway
8 coaches
450075
450008
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
22
2103
2103
2102¾
WR1
0.40
pass
2104½
pass
2104
WR1
DWF
1.29
3
2107
2107
2106½
2107½
2106½
2107½
1.78
pass
2109
pass
2108½
DWF
DW
2.50
3
pass
2110
pass
2109¾
DW
DWF
3.17
pass
2110½
pass
2110½
3.74
6
2112
2113
2112
2113
2112½
2114
+1
DWF
DWS
4.60
1
pass
2114½
pass
2115¾
+1
5.72
4
2116
2117
2116
2117
2117½
2118½
+1
7.07
4
pass
2119
pass
2120¾
+1
DWS
DR
8.21
2
pass
2120
pass
2122
+2
9.03
2
pass
2121
pass
2123
+2
9.57
1
2122
2123
2122
2123
2124
2125¼
+2
DR
DT
10.66
3
pass
2125
pass
2127
+2
11.22
5
2126
2127
2126
2127
2128
2129¼
+2
11.49
pass
2128
pass
2130
+2
12.43
2
2130
2130
2129½
2130
2131½
2132½
+2
13.03
pass
2131
pass
2133½
+2
13.35
pass
2131½
pass
2134
+2
14.68
2
2134
2134
2133½
2134½
2136
2137¼
+2
17.40
2
2138
2138
2138
2138½
2140¾
2141¾
+3
19.02
2
2141
2142
2141½
2142½
2144½
2145¾
+3
DT
DW
21.40
2
2146
2146
2146
2146½
2149
2150
+3
22.48
2
2149
2149
2148½
2149
2153
2153
+4
23.63
2
2152
2152
2151½
2152
2156
2156
+4
25.48
1
2156
2156
2201
+5