2U23 1003 London Waterloo to Windsor & Eton Riverside
Departing on 21st December 2024

operated by
South Western Railway
8 coaches
450062
450052
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
21
1003
1003
1002½
WR1
0.40
pass
1004½
pass
1003¾
WR1
DWF
1.29
3
1007
1007
1006½
1007½
1006½
1007½
1.78
pass
1009
pass
1008
-1
UD
2.50
3
pass
1010
pass
1010
DW
DWS
3.17
pass
1010½
pass
1010¼
3.74
6
1012
1013
1012
1013
1012
1014
+1
DWS
DWS
4.60
1
pass
1014½
pass
1015¾
+1
5.72
4
1016
1017
1016
1017
1017¼
1018
+1
7.07
4
pass
1019
pass
1020¼
+1
DWS
DR
8.21
2
pass
1020
pass
1021½
+1
9.03
2
pass
1021
pass
1022½
+1
9.57
1
1022
1023
1022
1023
1023½
1024½
+1
DR
DT
10.66
3
pass
1025
pass
1026¼
+1
11.22
5
1026
1027
1026
1027
1027
1028
+1
11.49
pass
1028
pass
1028¾
12.43
2
1030
1030
1029½
1030
1030¼
1031
+1
13.03
pass
1031
pass
1032
+1
13.35
pass
1031½
pass
1032½
+1
14.68
2
1034
1034
1033½
1034½
1034½
1035¼
17.40
2
1038
1038
1038
1038½
1038¾
1040¼
+1
19.02
2
1041
1042
1041½
1042½
1042¾
1044
+1
DT
DW
21.40
2
1046
1046
1046
1046½
1048
1048
+1
22.48
2
1049
1049
1048½
1049
1051
1052
+3
23.63
2
1052
1052
1051½
1052
1054
1055
+3
25.48
1
1056
1056
1059
+3