1D09 0724 London Waterloo to Dorking
Departing on 11th January 2025

operated by
South Western Railway
8 coaches
455731
455702
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 75mph
1
0724
0724
0756
+32
MSL
0.40
pass
0725½
No report
1.29
0727
0728
0727
0728
0759
0800
+32
1.78
pass
0729
No report
2.50
pass
0730
No report
3.26
pass
0731
No report
3.74
11
0732
0733
0732
0733
0804¼
0805
+32
DMS
DS
5.46
3
0736
0736
0736
0736½
0808
0808¾
+32
7.19
8
0740
0740
0739½
0740½
0811½
0812¾
+32
7.49
pass
0741½
pass
0813½
+32
8.51
4
0743
0743
0743
0743½
0815¾
0816½
+33
DS
DE
9.57
2
0746
0746
0746
0746½
0819¾
0820¼
+33
10.11
pass
0747½
pass
0821¼
+33
10.53
2
0749
0749
0748½
0749
0822¼
0823¼
+34
11.74
2
0752
0752
0751½
0752
0825¾
0826¼
+34
12.78
2
0754
0754
0754
0754½
0828¼
0829
+34
14.18
2
0758
0758
0757½
0758½
0833
0834
+35
DE
DP
16.19
2
0802
0802
0802
0802½
0837½
0839
+36
18.02
2
0806
0806
0805½
0806
0841
0841¾
+35
DP
DP
21.14
2
0811
0811
0810½
0811
0846
0846
+35
22.08
2
0814
0814
0849
+35