5Y82 0910 London Waterloo to Wimbledon Park Depot Sdgs
Departing on 9th January 2025

operated by
South Western Railway
10 coaches
701036
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 75mph
20
0910
0909¾
WR1
0.40
pass
0911½
pass
0911
WR1
DWF
1.29
3
pass
0914
pass
0913½
1.78
pass
0915½
pass
0914¾
DWF
DW
2.50
3
pass
0916½
pass
0915¾
DW
DWS
3.17
pass
0917½
pass
0916¼
-1
3.74
6
pass
0918½
pass
0917½
DWS
DWS
4.60
1
pass
0920
pass
0919¼
DWS
EPR
5.09
1
pass
0921
pass
0919
-2
DR
5.60
pass
0924½
pass
0919¼
-5
6.58
pass
0927
No report
7.50
2
pass
0929½
pass
0929½
DD
8.24
0931
0931
No report
EP