5Y83 0923 London Waterloo to Wimbledon Park Depot Sdgs
Departing on 6th January 2025

operated by
South Western Railway
8 coaches
London Waterloo - Wimbledon Park C.S.D.
455905
455862
8 coaches
Wimbledon Park C.S.D. - Wimbledon Park Depot Sdgs
455862
455905
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 75mph
15
0923
1005
+42
DW
0.40
pass
0924½
pass
1007
+42
DW
DWF
1.29
3
pass
0925½
pass
1009¼
+43
1.78
pass
0926½
pass
1010¼
+43
DWF
DW
2.50
3
pass
0927½
pass
1011½
+44
DW
DWS
3.17
pass
0929
pass
1012¼
+43
3.74
6
pass
0931
pass
1015½
+44
DWS
DWS
4.60
1
pass
0932½
pass
1018
+45
DWS
EPR
5.09
1
pass
0933½
pass
1018
+44
DR
5.60
East Putney [ZPU]
½
Service stops for pathing (passing train)
0935½
0939
1018
1018
+39
6.58
pass
0942
No report
7.50
2
pass
0944
pass
1027½
+43
DD
8.24
0946
0946
No report
EP