5S07 0510 Wimbledon Park Depot Sdgs to London Waterloo
Departing on 8th January 2025

operated by
South Western Railway
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Wimbledon Park Depot Sdgs
Pathed as Electric multiple unit at 75mph
0510
0517
+7
EFD
0.00
0515
0515
N/R
0518
+3
UF
0.58
pass
0516½
pass
0520½
+3
2.30
8
pass
0519½
pass
0523
+3
UF
UMF
2.78
pass
0520½
pass
0523½
+3
3.54
pass
0521
pass
0524¼
+3
4.26
pass
0522
pass
0525
+2
4.75
5
pass
0523
pass
0526
+3
5.64
pass
0524
pass
0527¼
+3
UMF
UMR
6.24
14
0526
0529½
+3
UMR