2F35 1350 London Waterloo to Woking
Departing on 9th January 2025

operated by
South Western Railway
8 coaches
450045
450023
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 75mph
3
1350
1350
1350½
DMS
0.40
pass
1351½
pass
1352
1.29
8
1353
1354
1353
1354
1355
1355¾
+1
1.78
pass
1355
pass
1357
+1
2.50
pass
1356
pass
1357¾
+1
3.26
pass
1357
pass
1358¼
+1
3.74
11
1358
1359
1358
1359
1400
1400¼
+1
DMS
DS
5.46
3
1402
1402
1402
1402½
1403
1403¾
+1
7.19
8
1406
1406
1405½
1406½
1406½
1407¾
+1
7.49
pass
1407½
pass
1408½
+1
8.51
3
pass
1408½
pass
1410
+1
9.62
4
pass
1409½
pass
1411
+1
10.78
2
pass
1411½
pass
1412¼
+1
12.03
4
1414
1414
1413½
1414½
1414¾
1415½
+1
DS
DS
13.26
pass
1416½
pass
1417¾
+1
14.30
4
1418
1418
1418
1418½
1419¼
1420½
+2
15.72
2
1421
1421
1421
1421½
1422½
1423½
+2
17.05
2
1424
1424
1423½
1424
1425½
1426¼
+2
19.11
3
1427
1427
1427
1427½
1429¼
1430
+2
DS
DS
20.26
pass
1429
No report
20.31
2
1430
1430
1429½
1430
1431¾
1432½
+2
DS
21.53
3
1433
1433
1432½
1433
1434¼
1436
+3
24.26
3
1438
1438
1440¾
+2
DS