2S45 1522 London Waterloo to Weybridge
Departing on 16th December 2024

operated by
South Western Railway
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
15
1522
1522
1522¼
DW
0.40
pass
1523½
pass
1523¾
DW
DWS
1.29
4
1526
1526
1525½
1526½
1526
1526¾
1.78
pass
1528
pass
1528
DWS
DW
2.50
3
1529
1529
1529
1529½
1529¼
1530
DW
DWF
3.17
pass
1530½
pass
1531
3.74
5
1532
1532
1531½
1532½
1532½
1533¼
4.60
2
1535
1535
1534½
1535
1535
1535¾
5.72
3
1537
1538
1537
1538
1538
1539
+1
7.07
3
1541
1542
1540½
1542½
1541¼
1542½
DWF
DH
7.54
2
1544
1544
1544
1544½
1544¼
1545
8.47
2
1547
1547
1546½
1547½
1547
1548
9.34
pass
1549
pass
1549½
9.53
2
1550
1550
1549½
1550
1550
1551
+1
10.01
pass
1551
pass
1551½
10.52
2
1552
1553
1552
1553
1553
1554
+1
11.34
2
1555
1555
1554½
1555
1555¾
1556½
+1
12.10
2
1557
1557
1556½
1557
1558¼
1559¼
+2
13.40
2
1600
1602
1559½
1602
1601½
1602½
14.19
pass
1603½
pass
1603¾
14.48
pass
1604½
pass
1604½
DH
DT
16.01
2
1608
1608
1607½
1608½
1607¼
1608¼
18.53
2
1612
1612
1612
1612½
1611¾
1612½
20.15
2
1616
1616
1615½
1616½
1615
1616½
22.15
2
1621
1621
1620½
1621
1620¾
1621¾
24.28
4
1625
1625
1625
1625½
1625¾
1626½
+1
DT
DC
26.68
1
1630
1631
1630
1631
1631
1632
+1
28.22
1
1634
1634
1633½
1634
1634¼
1635¾
+1
29.25
pass
1635½
pass
1637½
+2
30.05
Approaching
Weybridge [WYB]
1
1638
1638
1640
+2
DC