2U23 1003 London Waterloo to Windsor & Eton Riverside
Departing on 20th December 2024

operated by
South Western Railway
8 coaches
450093
450103
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
17
1003
1003
1003
DW
0.40
pass
1004½
pass
1005¾
+1
DW
DWF
1.29
3
1007
1007
1006½
1007½
1008¾
1010
+2
1.78
pass
1009
pass
1011¼
+2
DWF
DW
2.50
3
pass
1010
pass
1013
+3
DW
DWS
3.17
pass
1010½
pass
1014
+3
3.74
6
1012
1013
1012
1013
1016½
1017¾
+4
DWS
DWS
4.60
1
pass
1014½
pass
1020¼
+6
5.72
4
1016
1017
1016
1017
1022½
1023¼
+6
7.07
4
pass
1019
pass
1025¾
+6
DWS
DR
8.21
2
pass
1020
pass
1027¼
+7
9.03
2
pass
1021
pass
1028
+7
9.57
1
1022
1023
1022
1023
1029¼
1030½
+7
DR
DT
10.66
3
pass
1025
pass
1032½
+7
11.22
5
1026
1027
1026
1027
1033¼
1034¼
+7
11.49
pass
1028
pass
1035
+7
12.43
2
1030
1030
1029½
1030
1036½
1037½
+7
13.03
pass
1031
pass
1038½
+7
13.35
pass
1031½
pass
1039
+7
14.68
2
1034
1034
1033½
1034½
1041
1041¾
+7
17.40
2
1038
1038
1038
1038½
1045¼
1046¼
+7
19.02
2
1041
1042
1041½
1042½
1048¾
1049¾
+7
DT
DW
21.40
2
1046
1046
1046
1046½
1053
1054
+7
22.48
2
1049
1049
1048½
1049
1056
1057
+8
23.63
2
1052
1052
1051½
1052
1059
1100
+8
25.48
1
1056
1056
1104
+8