2U25 1033 London Waterloo to Windsor & Eton Riverside
Departing on 18th December 2024

operated by
South Western Railway
8 coaches
450075
450008
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
22
1033
1033
1033
WR1
0.40
pass
1034½
pass
1034½
WR1
DWF
1.29
3
1037
1037
1036½
1037½
1038¼
1039½
+2
1.78
pass
1039
pass
1040¾
+1
DWF
DW
2.50
3
pass
1040
pass
1042
+2
DW
DWS
3.17
pass
1040½
pass
1042½
+1
3.74
6
1042
1043
1042
1043
1044
1045
+2
DWS
DWS
4.60
1
pass
1044½
pass
1046¾
+2
5.72
4
1046
1047
1046
1047
1048¼
1049¼
+2
DS
7.07
4
pass
1049
pass
1051½
+2
DWS
DR
8.21
2
pass
1050
pass
1052¾
+2
9.03
2
pass
1051
pass
1053¾
+3
9.57
1
1052
1053
1052
1053
1055
1056¼
+3
DR
DT
10.66
3
pass
1055
pass
1058¼
+3
11.22
5
1056
1057
1056
1057
1059¼
1100½
+3
11.49
pass
1058
pass
1101
+3
12.43
2
1100
1100
1059½
1100
1102½
1104
+4
13.03
pass
1101
pass
1105
+4
13.35
pass
1101½
pass
1105½
+4
14.68
2
1104
1104
1103½
1104½
1107½
1108¾
+4
17.40
2
1108
1108
1108
1108½
1112
1113
+4
19.02
2
1111
1112
1111½
1112½
1115½
1116¼
+3
DT
DW
21.40
2
1116
1116
1116
1116½
1120
1121
+4
22.48
2
1119
1119
1118½
1119
1123
1124
+5
23.63
2
1122
1122
1121½
1122
1126
1127
+5
25.48
1
1126
1126
1131
+5