2U27 1103 London Waterloo to Windsor & Eton Riverside
Departing on 16th December 2024

operated by
South Western Railway
8 coaches
450052
450080
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
23
1103
1103
1104¼
+1
WR1
0.40
pass
1104½
pass
1105½
+1
WR1
DWF
1.29
3
1107
1107
1106½
1107½
1107¾
1109½
+2
1.78
pass
1109
pass
1110¾
+1
DWF
DW
2.50
3
pass
1110
pass
1112
+2
DW
DWS
3.17
pass
1110½
pass
1113
+2
3.74
6
1112
1113
1112
1113
1115¼
1116½
+3
DWS
DWS
4.60
1
pass
1114½
pass
1118¼
+3
5.72
4
1116
1117
1116
1117
1119¾
1121
+4
7.07
4
pass
1119
pass
1123
+4
DWS
DR
8.21
2
pass
1120
pass
1124¼
+4
9.03
2
pass
1121
pass
1125
+4
9.57
1
1122
1123
1122
1123
1126¼
1127½
+4
DR
DT
10.66
3
pass
1125
pass
1129¼
+4
11.22
5
1126
1127
1126
1127
1130¼
1131¼
+4
11.49
pass
1128
pass
1132
+4
12.43
2
1130
1130
1129½
1130
1133½
1134½
+4
13.03
pass
1131
pass
1135½
+4
13.35
pass
1131½
pass
1136
+4
14.68
2
1134
1134
1133½
1134½
1138
1139
+4
17.40
2
1138
1138
1138
1138½
1142½
1143½
+5
19.02
2
1141
1142
1141½
1142½
1146
1147½
+5
DT
DW
21.40
2
1146
1146
1146
1146½
1151
1152
+5
22.48
2
1149
1149
1148½
1149
1154
1155
+6
23.63
2
1152
1152
1151½
1152
1157
1158
+6
25.48
1
1156
1156
1202
+6