2U27 1103 London Waterloo to Windsor & Eton Riverside
Departing on 19th December 2024

operated by
South Western Railway
8 coaches
450114
450017
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
21
1103
1103
1104¼
+1
WR1
0.40
pass
1104½
pass
1105¼
WR1
DWF
1.29
3
1107
1107
1106½
1107½
1108
1109
+1
1.78
pass
1109
pass
1110
+1
DWF
DW
2.50
3
pass
1110
pass
1111¼
+1
DW
DWS
3.17
pass
1110½
pass
1112¼
+1
3.74
6
1112
1113
1112
1113
1114½
1115¾
+2
DWS
DWS
4.60
1
pass
1114½
pass
1117¼
+3
5.72
4
1116
1117
1116
1117
1119
1119¾
+2
7.07
4
pass
1119
pass
1122
+3
DWS
DR
8.21
2
pass
1120
pass
1123½
+3
9.03
2
pass
1121
pass
1124¼
+3
9.57
1
1122
1123
1122
1123
1125¼
1126½
+3
DR
DT
10.66
3
pass
1125
pass
1131
+6
11.22
5
1126
1127
1126
1127
1133
1134¼
+7
11.49
pass
1128
pass
1134¾
+7
12.43
2
1130
1130
1129½
1130
1136¼
1137
+7
13.03
pass
1131
pass
1138
+7
13.35
pass
1131½
pass
1138½
+7
14.68
2
1134
1134
1133½
1134½
1140½
1141½
+7
17.40
2
1138
1138
1138
1138½
1144¾
1145¾
+7
19.02
2
1141
1142
1141½
1142½
1148½
1149¼
+6
DT
DW
21.40
2
1146
1146
1146
1146½
1153
1153
+6
22.48
2
1149
1149
1148½
1149
1156
1157
+8
23.63
2
1152
1152
1151½
1152
1159
1159
+7
25.48
1
1156
1156
1203
+7