2F55 1850 London Waterloo to Woking
Departing on 7th January 2025

operated by
South Western Railway
8 coaches
455728
455848
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 75mph
3
1850
1850
1852½
+2
DMS
0.40
pass
1851½
pass
1854¼
+2
1.29
8
1853
1854
1853
1854
1857¼
1858½
+4
1.78
pass
1855
pass
1859¾
+4
2.50
pass
1856
pass
1900¾
+4
3.26
pass
1857
pass
1901½
+4
3.74
11
1858
1859
1858
1859
1903½
1904¼
+5
DMS
DS
5.46
3
1902
1902
1902
1902½
1908
1909¼
+6
7.19
8
1906
1906
1905½
1906½
1912¾
1913¾
+7
7.49
pass
1907½
pass
1914¾
+7
8.51
3
pass
1908½
pass
1916¼
+7
9.62
4
pass
1909½
pass
1918
+8
10.78
2
pass
1911½
pass
1919
+7
12.03
3
1914
1915
1913½
1915
1920½
1921¼
+6
DS
DS
13.26
3
pass
1917
pass
1923
+6
DS
14.30
4
1919
1919
1918½
1919
1924½
1926
+7
15.72
2
1922
1922
1921½
1922
1928¼
1929¼
+7
17.05
2
1924
1925
1924
1925
1931½
1932½
+7
19.11
3
1928
1929
1928
1929
1935½
1936½
+7
DS
DS
20.26
pass
1930½
No report
20.31
2
1931
1931
1931
1931½
1938½
1939¾
+8
DS
21.53
3
1934
1934
1934
1934½
1941½
1943
+8
24.26
3
1941
1939
1947¾
+8
DS