2S43 1538½ Feltham to Weybridge
Departing on 11th January 2025

operated by
South Western Railway

This service is partially cancelled

This service was cancelled between London Waterloo and Feltham due to an issue with the train crew (TG).

GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
1448
1448
-
0.40
pass
1449½
-
1.29
1452
1452
1451½
1452½
-
1.78
pass
1454
-
3.17
pass
1456
-
3.74
1458
1502
1457½
1502½
-
4.60
1505
1505
1504½
1505
-
5.72
1507
1508
1507
1508
-
7.07
1511
1512
1510½
1512½
-
7.54
1514
1514
1514
1514½
-
8.47
1517
1517
1516½
1517½
-
9.34
pass
1519
-
9.53
1520
1520
1519½
1520
-
10.01
pass
1521
-
10.52
1522
1523
1522
1523
-
11.34
1525
1525
1524½
1525
-
12.10
1527
1527
1526½
1527
-
13.40
1530
1532
1529½
1532
-
14.19
pass
1533½
-
14.48
pass
1534½
-
16.01
2
1538
1538
1537½
1538½
1551¼
+12
18.53
2
1542
1542
1542
1542½
1554¾
1555¼
+12
20.15
2
1546
1546
1545½
1546½
1557¾
1558¾
+12
22.15
2
1551
1551
1550½
1551
1603
1604
+13
24.28
4
1555
1555
1555
1555½
1608
1608¼
+12
DT
DC
26.68
1
1600
1601
1600
1601
1612¾
1613¼
+12
28.22
1
1604
1604
1603½
1604
1615¾
1616½
+12
29.25
pass
1605½
pass
1618¼
+12
30.05
Approaching
Weybridge [WYB]
1
1608
1608
1621
+13
DC