2S65 2022 London Waterloo to Weybridge
Departing on 19th December 2024

operated by
South Western Railway
4 coaches
450113
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
18
2022
2022
2022
DW
0.40
pass
2023½
pass
2023½
DW
DWF
1.29
3
2026
2026
2025½
2026½
2025½
2026½
1.78
pass
2028
pass
2027¾
DWF
DW
2.50
3
2029
2029
2029
2029½
2029
2029¾
DW
DWF
3.17
pass
2030½
pass
2030¾
3.74
5
2032
2032
2031½
2032½
2032¼
2033¼
4.60
2
2035
2035
2034½
2035
2035
2035¾
5.72
3
2037
2038
2037
2038
2038
2039
+1
7.07
3
2041
2042
2040½
2042½
2041¼
2042½
DWF
DH
7.54
2
2044
2044
2044
2044½
2044
2044¾
8.47
2
2047
2047
2046½
2047½
2046¾
2047½
9.34
pass
2049
pass
2049
9.53
2
2050
2050
2049½
2050
2049¾
2050½
10.01
pass
2051
pass
2051
10.52
2
2052
2053
2052
2053
2052½
2053¼
11.34
2
2055
2055
2054½
2055
2055
2055¾
12.10
2
2057
2057
2056½
2057
2057¼
2058
+1
13.40
2
2100
2102
2059½
2102
2100¼
2101¾
14.19
pass
2103½
pass
2102¾
14.48
pass
2104½
pass
2103½
DH
DT
16.01
2
2108
2108
2107½
2108½
2106
2107
-1
18.53
2
2112
2112
2112
2112½
2110¼
2111¾
20.15
2
2116
2116
2115½
2116½
2114¼
2115¾
22.15
2
2121
2121
2120½
2121
2120
2120¾
24.28
4
2125
2125
2125
2125½
2124¾
2125½
DT
DC
26.68
1
2130
2131
2130
2131
2129½
2130¾
28.22
1
2134
2134
2133½
2134
2133
2134
29.25
pass
2135½
pass
2135½
30.05
Approaching
Weybridge [WYB]
1
2138
2138
2138
DC